Sinrace Power Supply Technology (Shenzhen) Co., Ltd.

    English简体中文

为什么选择鑫锐斯?

您选择了我们:可获得什么样的实际优势?

我们是有多年历史的专业电源制造商,我们随时保持以您提供电源技术方面的解答和热诚服务,我们的团队主要责任是把重点放在不断去满足客户的需求。也是我们彼此能建立长久战略合作信赖的伙伴关系!以下是我们几点实际优势:

  • CRM完善的客户服务系统!
  • 10年以上电源研究制造历史! 
  • 先进的制造设备和高效率生产流程! 
  • 具有存熟的设计方案可确保安全稳定!
  • 严格的品质管控! 

资质认证


certifications

ErP: External Power Supply Implementing Measure (278/2009) PDF 打印 E-mail

The European Commission has adopted the eco-design requirement for External Power Supply (EPS) on April 6th 2009 and it came into force on April 27th 2009. The product requirements for EPS cover most AC / AC and AC / DC units that have a separate enclosure and an output power of 250W. It covers a wide range of products, e.g. power supplies for home electronics and IT equipment.

Implementation Stages

The implementing measure (IM) for EPS will be enforced in two stages with different minimum requirements. The first stage comes into effect on April 27th 2010 and the second stage on April 27th 2011. 

According to EU's Official Journal the requirements are:

EPS Table

The Implementing Measure covers products with the following characteristics:

  • Converts AC Power from mains into low voltage DC or AC output
  • Only one DC or AC output voltage at a time
  • A separate device that constitutes the primary load
  • Contained in a physical enclosure separate from the device
  • With removable or hard wired male/female connection, cable, cord, etc.
  • Rated output power less than 250W
  • Intended for use with electrical and electronic household and office equipment in EC No. 1275/2008
 
You are here: Home 开关电源技术博客 ErP: External Power Supply Implementing Measure (278/2009)